=== Building Terminals ===
 
=== Building Terminals ===
  
Terminals are purchasable in the ''Build Terminal'' link under the ''Gates'' menu. Terminals allow extra gates in areas where there may be no gates left. In order to build a terminal, you must have a base established at the airport. A terminal has a minimum of 5 gates, and the cost of building a gate is significantly more than normal renting of gates. Terminal gates only cost 75% to maintain (their rent is therefore 25% less than regular rental fees), so if one builds a terminal early enough in the round, the construction costs may be recovered through the money saved in reduced gate rental fees.
+
Terminals are purchasable in the ''Build Terminal'' link under the ''Operations'' menu. Terminals allow extra gates in areas where there may be no gates left. In order to build a terminal, you must have a base established at the airport. A terminal has a minimum of 5 gates, and the cost of building a gate is significantly more than normal renting of gates. Terminal gates only cost 75% to maintain (their rent is therefore 25% less than regular rental fees), so if one builds a terminal early enough in the round, the construction costs may be recovered through the money saved in reduced gate rental fees.
  
 
=== Extending Terminals ===
 
=== Extending Terminals ===
  
 
If you build 10 gates at once, one rented (not built gates) gate will automatically be returned. If you build 10 gates, remember you can only use 9 of them.
 
If you build 10 gates at once, one rented (not built gates) gate will automatically be returned. If you build 10 gates, remember you can only use 9 of them.

Revision as of 23:48, 23 March 2009

Building Terminals

Terminals are purchasable in the Build Terminal link under the Operations menu. Terminals allow extra gates in areas where there may be no gates left. In order to build a terminal, you must have a base established at the airport. A terminal has a minimum of 5 gates, and the cost of building a gate is significantly more than normal renting of gates. Terminal gates only cost 75% to maintain (their rent is therefore 25% less than regular rental fees), so if one builds a terminal early enough in the round, the construction costs may be recovered through the money saved in reduced gate rental fees.

Extending Terminals

If you build 10 gates at once, one rented (not built gates) gate will automatically be returned. If you build 10 gates, remember you can only use 9 of them.